船体检验员与船东代表的实用对话中英文

A: 钢材预处理后的表面粗糙度 Ra 值要求是多少?B: 要求 Ra≤50μm,测量结果符合。A: What's the required surface roughness Ra value after steel pretreatment?B: It's required to be Ra≤50μ...
  1. A: 钢材预处理后的表面粗糙度 Ra 值要求是多少?
    B: 要求 Ra≤50μm,测量结果符合。
    A: What's the required surface roughness Ra value after steel pretreatment?
    B: It's required to be Ra≤50μm, and the measurement result meets the standard.

  2. A: 这个分段的临时加强材数量不够,会影响吊装安全。
    B: 立即增加 2 根加强材,确保强度达标后再吊装。
    A: The number of temporary stiffeners for this section is insufficient, which will affect hoisting safety.
    B: Add 2 more stiffeners immediately to ensure strength meets the standard before hoisting.

  3. A: 射线检测的底片质量太差,无法判断焊缝内部质量。
    B: 重新进行射线检测,调整曝光参数确保底片清晰。
    A: The quality of the radiographic film is too poor to judge the internal quality of the weld.
    B: Re-conduct radiographic testing and adjust exposure parameters to ensure clear films.

  4. A: 肋骨与外板的间隙超过 2mm,不符合装配要求。
    B: 用楔铁调整间隙,确保贴合紧密后再焊接。
    A: The gap between the frame and the shell plate exceeds 2mm, which does not meet the assembly requirements.
    B: Adjust the gap with wedge irons to ensure tight fit before welding.

  5. A: 套料时出现了零件重叠,导致材料浪费。
    B: 检查套料软件参数,重新排版避免重叠。
    A: Part overlap occurred during nesting, causing material waste.
    B: Check nesting software parameters and re-layout to avoid overlap.

  6. A: 火焰切割的预热温度不够,导致切口有裂纹。
    B: 提高预热温度至 150℃,重新切割不合格零件。
    A: The preheating temperature for flame cutting is insufficient, resulting in cracks in the cut.
    B: Increase the preheating temperature to 150℃ and re-cut unqualified parts.

  7. A: 船台中心线的标记有偏差,需要重新校准。
    B: 用激光投线仪重新标记,确保中心线误差≤1mm。
    A: The marking of the berth centerline has deviation and needs re-calibration.
    B: Re-mark with a laser line projector to ensure centerline error ≤1mm.

  8. A: 底漆与钢板的附着力测试不合格,划格处有脱落。
    B: 清理表面后重新喷涂底漆,再次测试。
    A: The adhesion test between primer and steel plate failed, with peeling at the cross-cut.
    B: Clean the surface, re-spray primer, and test again.

  9. A: 三辊弯板机的辊轴平行度超差,影响弯板精度。
    B: 调整辊轴位置,确保平行度误差≤0.1mm/m。
    A: The parallelism of the roll shafts of the three-roll bending machine is out of tolerance, affecting bending accuracy.
    B: Adjust the roll shaft position to ensure parallelism error ≤0.1mm/m.

  10. A: 装配用的定位马焊接太牢固,拆除时损伤了母材。
    B: 改用可拆卸式夹具,避免焊接定位马。
    A: The positioning strips used for assembly are welded too firmly, damaging the base material when removed.
    B: Use detachable clamps instead to avoid welding positioning strips.

  11. A: 焊缝的咬边深度达到 1.2mm,超过 0.5mm 的允许值。
    B: 对咬边部位进行补焊,打磨平整后重新检验。
    A: The undercut depth of the weld reaches 1.2mm, exceeding the allowable 0.5mm.
    B: Fill weld the undercut area, grind flat, and re-inspect.

  12. A: 数学放样的型值表与图纸核对有出入,哪里出错了?
    B: 是软件版本问题,已更新最新图纸数据重新计算。
    A: There's a discrepancy between the mathematical lofting offset table and the drawing. What went wrong?
    B: It's a software version issue. We've updated the latest drawing data and recalculated.

  13. A: 酸洗后的钢材表面有残留酸液,会导致二次锈蚀。
    B: 增加中和处理工序,确保 pH 值达到 7-8。
    A: There's residual acid on the surface of pickled steel, which will cause secondary rust.
    B: Add a neutralization process to ensure pH reaches 7-8.

  14. A: 分段吊装时的吊点位置不符合图纸,容易变形。
    B: 按图纸重新设置吊点,计算受力确保安全。
    A: The lifting point position during section hoisting does not match the drawing, which may cause deformation.
    B: Reset lifting points according to the drawing and calculate the force to ensure safety.

  15. A: 磁粉探伤的磁悬液浓度不够,影响缺陷显示。
    B: 调整磁悬液浓度至 1.2-2.4mL/100mL,重新检测。
    A: The concentration of magnetic suspension for magnetic particle inspection is insufficient, affecting defect display.
    B: Adjust the concentration to 1.2-2.4mL/100mL and re-test.

  16. A: 板材剪切后的对角线偏差超过 3mm,矩形度不合格。
    B: 调整剪床的定位装置,确保对角线偏差≤2mm。
    A: The diagonal deviation of the sheared plate exceeds 3mm, and the rectangularity is unqualified.
    B: Adjust the positioning device of the shearing machine to ensure diagonal deviation ≤2mm.

  17. A: 总段对接时的错边量达到 4mm,要求不超过 2mm。
    B: 用液压千斤顶顶推调整,减少错边量至合格范围。
    A: The misalignment during block butt joint reaches 4mm, requiring no more than 2mm.
    B: Use a hydraulic jack to push and adjust to reduce misalignment to the qualified range.

  18. A: 焊接用的焊条烘干温度不够,会导致气孔缺陷。
    B: 将烘干温度提高到 350℃,保温 1 小时后再使用。
    A: The drying temperature of welding electrodes is insufficient, which may cause porosity defects.
    B: Increase the drying temperature to 350℃, keep it warm for 1 hour before use.

  19. A: 外板展开的尺寸与理论值偏差 5mm,会影响装配。
    B: 重新计算展开尺寸,修正后重新号料切割。
    A: The dimension of the shell plate development deviates 5mm from the theoretical value, which will affect assembly.
    B: Recalculate the development dimension, correct it, and re-mark and cut.

  20. A: 抛丸后的钢材表面有油污,是哪里污染的?
    B: 是输送辊道不干净,已清理辊道并重新抛丸。
    A: There's oil on the surface of shot-blasted steel. Where is the pollution from?
    B: The conveyor roller is dirty. We've cleaned the roller and re-blasted.

  21. A: 肋骨弯曲后的回弹量超过 1°,需要补偿弯曲。
    B: 增加 1.5° 的预弯量,抵消回弹影响。
    A: The springback of the bent frame exceeds 1°, requiring compensation bending.
    B: Add a pre-bending amount of 1.5° to offset the springback effect.

  22. A: 装配焊接顺序不合理,导致分段产生扭曲变形。
    B: 调整为对称焊接、从中间向两边施焊的顺序。
    A: The assembly and welding sequence is unreasonable, causing torsional deformation of the section.
    B: Adjust to symmetric welding, starting from the middle to both sides.

  23. A: 水压试验的压力达到设计值后,保压时间需要多久?
    B: 要求保压 30 分钟,压力降不超过 0.05MPa 为合格。
    A: After the water pressure test reaches the design value, how long is the pressure holding time?
    B: It's required to hold pressure for 30 minutes, and a pressure drop not exceeding 0.05MPa is qualified.

  24. A: 号料时误用了旧版本图纸,导致零件尺寸错误。
    B: 立即停用旧图纸,更换新版本并重新号料。
    A: The old version of the drawing was mistakenly used for marking-off, resulting in wrong part dimensions.
    B: Immediately stop using the old drawing, replace with the new version, and re-mark.

  25. A: 激光切割的焦点位置不对,导致切口上下宽度不一致。
    B: 调整焦点位置至板材厚度中心,确保切口垂直。
    A: The focus position of laser cutting is incorrect, resulting in inconsistent upper and lower width of the cut.
    B: Adjust the focus position to the center of the plate thickness to ensure vertical cut.

  26. A: 舱壁上的扶强材间距偏差有 10mm,要求 ±5mm。
    B: 重新定位扶强材,调整间距至合格范围。
    A: The spacing deviation of the stiffeners on the bulkhead is 10mm, requiring ±5mm.
    B: Reposition the stiffeners and adjust the spacing to the qualified range.

  27. A: 渗透探伤的显像剂涂层太厚,掩盖了细小缺陷。
    B: 减少显像剂喷涂量,形成薄而均匀的涂层。
    A: The penetrant testing developer coating is too thick, covering small defects.
    B: Reduce the amount of developer spray to form a thin and uniform coating.

  28. A: 板材的拼接焊缝与骨材重合,削弱了结构强度。
    B: 调整板缝位置,确保与骨材间距≥100mm。
    A: The butt weld of the plate coincides with the stiffener, weakening the structural strength.
    B: Adjust the plate seam position to ensure a distance of ≥100mm from the stiffener.

  29. A: 预弯时的压力不足,导致滚弯后的板材两端有直边。
    B: 增加预弯压力,确保板材两端完全贴合辊轴。
    A: Insufficient pressure during pre-bending results in straight edges at both ends of the rolled plate.
    B: Increase pre-bending pressure to ensure both ends of the plate are fully attached to the roll shaft.

  30. A: 完工后的船体总长与设计值偏差 8mm,是否合格?
    B: 合格,总长允许偏差≤10mm,在范围内。
    A: The total length of the completed hull deviates 8mm from the design value. Is it qualified?
    B: Qualified, the allowable deviation of total length is ≤10mm, which is within the range.

  31. A: 钢材的屈服强度测试结果比标准值低 5MPa,是否可接受?
    B: 不可接受,必须符合标准值 ±10MPa 的范围,要求换货。
    A: The yield strength test result of steel is 5MPa lower than the standard value. Is it acceptable?
    B: Not acceptable. It must meet the range of standard value ±10MPa, and replacement is required.

  32. A: 分段的对角线长度差超过 5mm,会影响总段对接。
    B: 用拉紧器调整分段形状,减少对角线差至≤3mm。
    A: The diagonal length difference of the section exceeds 5mm, which will affect block butt joint.
    B: Use a tensioner to adjust the section shape to reduce the diagonal difference to ≤3mm.

  33. A: 焊接后的角变形达到 3°,需要火工矫正吗?
    B: 需要,矫正后角变形应控制在≤1°。
    A: The angular deformation after welding reaches 3°. Is flame straightening needed?
    B: Yes, after straightening, the angular deformation should be controlled at ≤1°.

  34. A: 数学放样的样条函数拟合度不够,型线有波动。
    B: 增加插值点数量,提高拟合精度确保型线光顺。
    A: The spline function fitting degree of mathematical lofting is insufficient, and the line fluctuates.
    B: Increase the number of interpolation points to improve fitting accuracy and ensure line fairness.

  35. A: 抛丸机的抛丸量不足,导致除锈效率低。
    B: 调整抛丸器转速,增加抛丸量至设计值。
    A: The shot output of the shot blasting machine is insufficient, resulting in low derusting efficiency.
    B: Adjust the speed of the shot blaster to increase the shot output to the design value.

  36. A: 肋骨与纵骨的交点处焊接未焊透,是坡口太小导致的吗?
    B: 是的,将坡口角度从 45° 增大到 60°,确保焊透。
    A: The weld at the intersection of frame and longitudinal is incomplete penetration. Is it caused by too small groove?
    B: Yes, increase the groove angle from 45° to 60° to ensure penetration.

  37. A: 板材的平面度在轧制方向合格,但横向超差,为什么?
    B: 是轧制应力分布不均,需进行整体矫平处理。
    A: The flatness of the plate is qualified in the rolling direction but out of tolerance in the transverse direction. Why?
    B: It's due to uneven distribution of rolling stress, requiring overall flattening.

  38. A: 真空试验的负压值达到 - 0.08MPa,保压时间要求多久?
    B: 保压 30 分钟,压力升不超过 0.02MPa 为合格。
    A: The negative pressure value of the vacuum test reaches -0.08MPa. What's the required pressure holding time?
    B: Hold pressure for 30 minutes, and a pressure rise not exceeding 0.02MPa is qualified.

  39. A: 号料用的样板有磨损,导致零件尺寸偏差累积。
    B: 更换新样板,并定期校验样板精度。
    A: The template used for marking-off is worn, resulting in accumulated part dimension deviation.
    B: Replace with new templates and regularly verify template accuracy.

  40. A: 等离子切割的速度过快,导致切口有熔渣附着。
    B: 降低切割速度 10%,确保切口干净无熔渣。
    A: The plasma cutting speed is too fast, resulting in slag adhesion on the cut.
    B: Reduce the cutting speed by 10% to ensure the cut is clean without slag.

  41. A: 总段的水平度偏差有 8mm,会影响船台合拢精度。
    B: 调整总段支撑高度,使水平度偏差≤5mm。
    A: The levelness deviation of the block is 8mm, which will affect berth joining accuracy.
    B: Adjust the block support height to make levelness deviation ≤5mm.

  42. A: 焊缝的余高不足,只有 1mm,要求 2-3mm。
    B: 对焊缝进行补焊,控制余高在规定范围。
    A: The weld reinforcement is insufficient, only 1mm, requiring 2-3mm.
    B: Fill weld the weld to control reinforcement within the specified range.

  43. A: 酸洗池的酸浓度太低,除锈效果差。
    B: 补充酸液,将浓度调整至 15-20%。
    A: The acid concentration in the pickling bath is too low, resulting in poor derusting effect.
    B: Supplement acid solution to adjust the concentration to 15-20%.

  44. A: 装配时的定位基准与设计基准不一致,导致尺寸偏差。
    B: 统一基准为船台中心线和基线,重新定位。
    A: The positioning datum during assembly is inconsistent with the design datum, resulting in dimension deviation.
    B: Unify the datum as the berth centerline and baseline, and reposition.

  45. A: 射线检测的透照厚度比不符合要求,底片对比度差。
    B: 更换合适的射线源,确保透照厚度比≤1.5。
    A: The penetration thickness ratio of radiographic testing does not meet the requirements, and the film contrast is poor.
    B: Replace with a suitable radiation source to ensure penetration thickness ratio ≤1.5.

  46. A: 肋骨弯圆机的模具磨损,导致肋骨成形尺寸不稳定。
    B: 更换新模具,并定期测量模具尺寸。
    A: The die of the frame bending machine is worn, resulting in unstable frame forming dimensions.
    B: Replace with new dies and regularly measure die dimensions.

  47. A: 板材拼接时的错边量达到 3mm,超过 1.5mm 的允许值。
    B: 用卡兰校正错边,确保错边量≤1mm 后再焊接。
    A: The misalignment during plate splicing reaches 3mm, exceeding the allowable 1.5mm.
    B: Correct the misalignment with clamps to ensure misalignment ≤1mm before welding.

  48. A: 焊接用的保护气体纯度不够,焊缝有气孔。
    B: 更换纯度≥99.99% 的保护气体,重新焊接。
    A: The purity of the shielding gas used for welding is insufficient, and the weld has porosity.
    B: Replace with shielding gas with purity ≥99.99% and re-weld.

  • 发表于 2025-08-16 12:36
  • 阅读 ( 34 )

你可能感兴趣的文章

相关问题

0 条评论

请先 登录 后评论
青衫故人
青衫故人

海员-大副

237 篇文章

作家榜 »

  1. 海员学院 344 文章
  2. 织光 247 文章
  3. 青衫故人 237 文章
  4. 四处漂泊 225 文章
  5. 海员 223 文章
  6. 海贼王 210 文章
  7. 朱亚文 192 文章
  8. 笑的太拽 185 文章

文件生成中...

请稍候,系统正在生成您请求的文件

请点击下载或复制按钮进行操作