东京备忘录PSC滞留与缺陷的检查趋势总结

A. Paris MoU 关于东京备忘录PSC滞留与缺陷的检查趋势总结 a) Detainable deficiencies FIRE SAETY - Fire Dampers of E/R supplier fans not workings & duct distortion - Fire Doors...

A. Paris MoU 关于东京备忘录PSC滞留与缺陷的检查趋势总结

a) Detainable deficiencies

FIRE SAETY

- Fire Dampers of E/R supplier fans not workings & duct distortion

- Fire Doors – upper deck entrance to staircase distortion)

- Emergency fire pump found inoperative during test

- A-class fire door in galley fixed to open

- Water mist system defective

- Some fire doors defective and not closed completely

- Several self-closing valves for sounding pipes and for level indicators blocked in open position

- Oil leakage from main engine oil cooler through damaged gaskets

- Main fire line on main deck inoperative (frozen)

- Leakage of fire hose and corrosion of fire main line

- Clogged Paint room sprinkle nozzles failed to activate

- Full of oil mixture in engine room bilge well

- Air leaking from SCBA

- Malfunction of Quick Closing Valve for fuel oil tank

- Fixed CO2 bottle hose loosening- Galley Exhaust Trunk Oily and Dirty(Risk of Fire)

- Quick closing valve malfunction

ISM- ISM detainable deficiency on the basis of many deficiencies- Collision due to non-compliance with COLREG- Fire drill not satisfactory- Crew not familiar with working language- Crew not familiar with fixed CO2 system- Crew not familiar with RADAR operation and emergency steering- Inappropriate implementation of enclosed space procedures- Officers unable to demonstrate operation of free fall lifeboat- SMS implementation failure- Crew unfamiliar with operation of machinery and position of equipment on board

- No records of lifeboat operation

ISPS- Outdated CSR on board- MLC (Working and Living Condition)- Accommodation heating systems- Toilets flushing system in the accommodation not working correctly- Accommodation not in cleanliness- All crew members' wages not paid in full and at monthly intervals- Total lack of fresh vegetables and fruit. Rotten cabbage visible in veggie store- Water is galley is very dirty and basin clogged, no usable hot water available for handwash andsafe preparation of meals- SEA(Seafarer employment agreement) expired, over maximum period of shipboard servicefor seafarers- Two(2) crewmembers on board with illegal extension/to more than allowed by CBA- Two(2) ratings not complying with STCW convention- Air conditioner malfunction (spare part not on board)- After drydock, garbage and spare parts stowed all along the main deck- Medical Oxygen are not ready to use immediately- Quantity and position of Laundry equipment is not adequate

- Due to Black out, all toilet are not available and living condition is under standard (no water, heating)

Life Saving Appliances

- Lifeboat Engine not starting

- Lifeboats not lowered and maneuvered into the water

- Rescue boat and life raft defective- Life raft expired- Garbage interfering the operation of port liferaft- Magnetic compass in lifeboat defective- Rescue boat launching davit hydraulic leaks and pressure gauge inoperative- Breathing apparatus set back rack broken- Several EEBDs with insufficient air pressure- Liferaft ladders P and S rope rutten in splice- Liferaft is stored in another location- Malfunction of emergency light in way of rescue boat launching area- Malfunction of light Life Buoy- Pollution Prevention- Deck full of oil pollution hazards- Insufficient procedure for changeover when entering SECA (Aux. Engines and boiler)- Sewage treatment plant not working properly- OWS sampling pipe closed, and circulated with fresh water only to indicate 0ppm on oil contentMonitor- Eng. Room Bilge High water level alarm inoperative- Oily Water Separator inoperative and found some leakage- Hatch cover hydraulic cylinder found leaking- OWS solenoid valve inoperative- Retention indicated in Oil record book for M/E Scav. Air box drain tank is; 0.2m3. Retention reallyfound on board in drain tank is; 0.12m3. 0.08m3 missing- Full of Residual tank(Sludge tank) & bilge collecting tank(Not correctly filled out on oil record book)- Many casks with sludge oil found on board- Oil spill during bunkering (Not in accordance with bunkering procedure)- NOx Technical File not on board

- BWTS inoperable and three(3) alarms can not be reset

ILL- Side shell crack- Manhole from engine room to bilge keel space in open- Hatch coaming bracket crack- Air vent head damaged and seized with metallic float disc broken and seized rubber seal detached,Natural ventilator (mushroom type) holed and patched temporally, Gooseneck air vent closing devices missing- Hatch cover cleat missing

- Missing hinge for cargo hold ventilator damper and poor condition of closing device

Certificate and Documentation

- Civil liability for bunker oil pollution damage certification is not valid (Only photocopy)

- CSR Document missing

- Oily water discharged illegally (Cert. not valid)

- Flag endorsement missing for 2/O, 3/O and C/E

- Medical certificate expired

- Captain not holding GMDSS General Operator certificate (GOC)

- No Safety Management Certificate (SMC) on board

- SOLAS Training Manual and Fire Fighting Manual is different from ship details

- SEAs(Seafarers’ employment agreement) of all crew members are not original and not signed by the ship owner(Stamp only)

- Interim MLC certificates were issued two times consecutively

- IBWM certificate is not valid. (IOPP renewal was conducted under permission of Flag with extension of BWTS of installation)

Safety of Navigation

- VDR is inoperative

- Several navigation lights damaged and inoperative

- ECDIS not in use up to date (ENC outdated) and malfunction

- Paper charts for intended voyage not up to date

- MF/HF and VHF DSC not operational

- No charts and nautical publications available

- Bridge found one window of different thickness(much less)

- Whistle inoperative

- AIS signal weak

- Gyro repeater of port/stbd side is not synchronized with bridge Gyro Compass

- INMARSAT C fault

- MH/HF antenna damaged

- Working language recorded on ship’s official log book are English and Vietnamese

Others

- Several steam and water leakages on deck steam pipes

- Emergency exit from engine room blocked from inside by steel plate

- Insufficient ventilation of cargo holds before entering a port (excess of LEL limitation)

- No corrective action taken against deficiencies identified during the last PSC inspection

- Several nuts and bolts for void space manholes in Bosun store missing

- Boiler water level sight glass malfunction

- Incinerator not properly maintained (diesel oil solenoid valve defective)

- Gangway accommodation ladder unsafe (broken stanchion)

- Ballast water exchange not performed before entering the port

- Two sailing directions not regularly updated

- Emergency lights not working properly

- Several manholes for ballast water tanks on portside and starboard side not properly closed/Missing nuts/Damaged gaskets

- Improper modification on SWBD

- E/R direct bilge valve not able to open

- Bilge alarm floaters in C/H functionally damaged

- EPIRB test inoperative, periodical GMDSS log not on board

- Loss of seaworthiness due to flooding of steering gear room(water-tight door was open)

- Black out due to lack of fuel and failed to recover the power


b) Items to be inspected thoroughly

FIRE SAETY

- Operation of em’cy fire pump and leak check(If it can be run in 5 minutes without any leakage, required minimum pressure of suction: -500mmHg, discharge: 3kg/c㎡)

- Function and contact condition of E/R funnel damper

- Condition of Fireman’s outfit

- Closing condition of A-class fire door

- Fire doors in normal operation

- Installation of insulation for heat surface

- Enough ventilation of cargo holds before entering a port

- Check operation of water mist system

- Check of breathing apparatus and its attachment

- Self-closing valves for sounding pipes and for level indicators

- Operation and maintenance of main engine oil cooler

- Sprinkler nozzles in normal working condition without blockage of deposits in the nozzles

ISM

- Implementation of Fire and Abandon ship Drill and record

(See attached Check point of Fire and Abandon ship Drill in UK)

- Black out test (simulation test) and crews’ familiarity with it

- Crews’ familiarity with the operation of CO2 system (delay time, bottle quantity, etc.)

- PSCO emphasizes implementation of ISM and checks real-time NIR database

- Drill records for emergency response

- SMS on board properly implemented

- Crew familiarization with machinery and position of equipment on board

- Correspondence and familiarization of SOLAS training manual and equipment on board

- Check effectiveness of emergency drills and familiarity related to responsible equipment/

installation/appliances and system

- Crew familiarization with lifeboat operation

- Compliance of procedures for enclosed space entry

- Check compliance of COLREG of duty officers

- MLC(Working and Living Condition)

- Crews protection (safety devices)

- Crew’s including captain and C/E working hour and resting hour record

- Toilet operation in accommodation

- Accommodation cleanness

- Wages paid regularly and in full accordance with seafarer’s employment agreement(SEA)

- Period of seafarer’s contract

- Expiry date of medicine

- Life Saving Appliances

- Immediate start of em’cy equipment under very cold weather

(Starting of em’cy generator engine & lifeboat engine, etc.)

- Magnetic compass in lifeboat

- Hydraulic system in launching appliance for rescue boat

- Condition of rescue boat and liferaft

- Navigation and radio equipment in good working condition for immediate use

- EEBDs with sufficient air pressure and good working condition

- Pollution Prevention

- Operation of sewage treatment plant

- Inspection related to SOx emission (bunker notes, sampling log book, bunker change procedure)

- Operation of quick closing valve (including em’cy generator DO tank)

- Control of garbage (garbage record, galley and toilet condition etc.)

- Changing over fuel oil with Sulphur below 1.0% before entering into SECA area

- Procedures for fuel changeover when entering SECA

- Function of oily water separator and 15ppm alarm check (oil check inside discharge pipe and check for proper record of oil record book)

- High water level alarm(Eng. room)

- Hatch cover hydraulic cylinder in good working condition

- Oily Water Separator (OWS) in proper working condition

ILL

- Condition of structure (hatch cover cleat, air vent head)(hammering test)

- Function of water ingress system and de-watering system

- Manhole properly secured, closed

- Certificate and Documentation

- Each Certificate (ESP File) and valid crew’s license

- Valid Medical Certificate

Safety of Navigation

- VDR function and random alarm test and normal condition check after reset

- Navigation plan (berth to berth) and up-to-date notice to mariner, chart and publication

- Function of GMDSS (DC Power) and familiarity with GMDSS equipment

- Check condition of navigation lights

- Check ECDIS/ENC in use up to date

Others

- Ten (10) major detainable deficiencies and overall inspection

- Extended inspection for bulk carrier more than 15 years

- Any obstacles to interrupt safety escape from emergency escape route from E/R

- Corrosive condition of Gangway

- Engine room and S/G room cleanses (connections for piping system, oily insulation for piping, around D/G fuel pump, purifier room floor.

- Boiler water level sight glass in normal condition

- Incinerator properly maintained and in good working condition

- Em'cy lights in good working condition

  • 发表于 2023-05-28 19:06
  • 阅读 ( 371 )

你可能感兴趣的文章

相关问题

0 条评论

请先 登录 后评论
浊酒尽余欢
浊酒尽余欢

海员-大管轮

142 篇文章

作家榜 »

  1. 海员学院 345 文章
  2. 织光 247 文章
  3. 青衫故人 238 文章
  4. 四处漂泊 225 文章
  5. 海员 223 文章
  6. 海贼王 210 文章
  7. 朱亚文 197 文章
  8. 起风了 189 文章

文件生成中...

请稍候,系统正在生成您请求的文件

请点击下载或复制按钮进行操作