A. Paris MoU 关于东京备忘录PSC滞留与缺陷的检查趋势总结
a) Detainable deficiencies
FIRE SAETY
- Fire Dampers of E/R supplier fans not workings & duct distortion
- Fire Doors – upper deck entrance to staircase distortion)
- Emergency fire pump found inoperative during test
- A-class fire door in galley fixed to open
- Water mist system defective
- Some fire doors defective and not closed completely
- Several self-closing valves for sounding pipes and for level indicators blocked in open position
- Oil leakage from main engine oil cooler through damaged gaskets
- Main fire line on main deck inoperative (frozen)
- Leakage of fire hose and corrosion of fire main line
- Clogged Paint room sprinkle nozzles failed to activate
- Full of oil mixture in engine room bilge well
- Air leaking from SCBA
- Malfunction of Quick Closing Valve for fuel oil tank
- Fixed CO2 bottle hose loosening- Galley Exhaust Trunk Oily and Dirty(Risk of Fire)
- Quick closing valve malfunction
ISM- ISM detainable deficiency on the basis of many deficiencies- Collision due to non-compliance with COLREG- Fire drill not satisfactory- Crew not familiar with working language- Crew not familiar with fixed CO2 system- Crew not familiar with RADAR operation and emergency steering- Inappropriate implementation of enclosed space procedures- Officers unable to demonstrate operation of free fall lifeboat- SMS implementation failure- Crew unfamiliar with operation of machinery and position of equipment on board
- No records of lifeboat operation
ISPS- Outdated CSR on board- MLC (Working and Living Condition)- Accommodation heating systems- Toilets flushing system in the accommodation not working correctly- Accommodation not in cleanliness- All crew members' wages not paid in full and at monthly intervals- Total lack of fresh vegetables and fruit. Rotten cabbage visible in veggie store- Water is galley is very dirty and basin clogged, no usable hot water available for handwash andsafe preparation of meals- SEA(Seafarer employment agreement) expired, over maximum period of shipboard servicefor seafarers- Two(2) crewmembers on board with illegal extension/to more than allowed by CBA- Two(2) ratings not complying with STCW convention- Air conditioner malfunction (spare part not on board)- After drydock, garbage and spare parts stowed all along the main deck- Medical Oxygen are not ready to use immediately- Quantity and position of Laundry equipment is not adequate
- Due to Black out, all toilet are not available and living condition is under standard (no water, heating)
Life Saving Appliances
- Lifeboat Engine not starting
- Lifeboats not lowered and maneuvered into the water
- Rescue boat and life raft defective- Life raft expired- Garbage interfering the operation of port liferaft- Magnetic compass in lifeboat defective- Rescue boat launching davit hydraulic leaks and pressure gauge inoperative- Breathing apparatus set back rack broken- Several EEBDs with insufficient air pressure- Liferaft ladders P and S rope rutten in splice- Liferaft is stored in another location- Malfunction of emergency light in way of rescue boat launching area- Malfunction of light Life Buoy- Pollution Prevention- Deck full of oil pollution hazards- Insufficient procedure for changeover when entering SECA (Aux. Engines and boiler)- Sewage treatment plant not working properly- OWS sampling pipe closed, and circulated with fresh water only to indicate 0ppm on oil contentMonitor- Eng. Room Bilge High water level alarm inoperative- Oily Water Separator inoperative and found some leakage- Hatch cover hydraulic cylinder found leaking- OWS solenoid valve inoperative- Retention indicated in Oil record book for M/E Scav. Air box drain tank is; 0.2m3. Retention reallyfound on board in drain tank is; 0.12m3. 0.08m3 missing- Full of Residual tank(Sludge tank) & bilge collecting tank(Not correctly filled out on oil record book)- Many casks with sludge oil found on board- Oil spill during bunkering (Not in accordance with bunkering procedure)- NOx Technical File not on board
- BWTS inoperable and three(3) alarms can not be reset
ILL- Side shell crack- Manhole from engine room to bilge keel space in open- Hatch coaming bracket crack- Air vent head damaged and seized with metallic float disc broken and seized rubber seal detached,Natural ventilator (mushroom type) holed and patched temporally, Gooseneck air vent closing devices missing- Hatch cover cleat missing
- Missing hinge for cargo hold ventilator damper and poor condition of closing device
Certificate and Documentation
- Civil liability for bunker oil pollution damage certification is not valid (Only photocopy)
- CSR Document missing
- Oily water discharged illegally (Cert. not valid)
- Flag endorsement missing for 2/O, 3/O and C/E
- Medical certificate expired
- Captain not holding GMDSS General Operator certificate (GOC)
- No Safety Management Certificate (SMC) on board
- SOLAS Training Manual and Fire Fighting Manual is different from ship details
- SEAs(Seafarers’ employment agreement) of all crew members are not original and not signed by the ship owner(Stamp only)
- Interim MLC certificates were issued two times consecutively
- IBWM certificate is not valid. (IOPP renewal was conducted under permission of Flag with extension of BWTS of installation)
Safety of Navigation
- VDR is inoperative
- Several navigation lights damaged and inoperative
- ECDIS not in use up to date (ENC outdated) and malfunction
- Paper charts for intended voyage not up to date
- MF/HF and VHF DSC not operational
- No charts and nautical publications available
- Bridge found one window of different thickness(much less)
- Whistle inoperative
- AIS signal weak
- Gyro repeater of port/stbd side is not synchronized with bridge Gyro Compass
- INMARSAT C fault
- MH/HF antenna damaged
- Working language recorded on ship’s official log book are English and Vietnamese
Others
- Several steam and water leakages on deck steam pipes
- Emergency exit from engine room blocked from inside by steel plate
- Insufficient ventilation of cargo holds before entering a port (excess of LEL limitation)
- No corrective action taken against deficiencies identified during the last PSC inspection
- Several nuts and bolts for void space manholes in Bosun store missing
- Boiler water level sight glass malfunction
- Incinerator not properly maintained (diesel oil solenoid valve defective)
- Gangway accommodation ladder unsafe (broken stanchion)
- Ballast water exchange not performed before entering the port
- Two sailing directions not regularly updated
- Emergency lights not working properly
- Several manholes for ballast water tanks on portside and starboard side not properly closed/Missing nuts/Damaged gaskets
- Improper modification on SWBD
- E/R direct bilge valve not able to open
- Bilge alarm floaters in C/H functionally damaged
- EPIRB test inoperative, periodical GMDSS log not on board
- Loss of seaworthiness due to flooding of steering gear room(water-tight door was open)
- Black out due to lack of fuel and failed to recover the power
b) Items to be inspected thoroughly
FIRE SAETY
- Operation of em’cy fire pump and leak check(If it can be run in 5 minutes without any leakage, required minimum pressure of suction: -500mmHg, discharge: 3kg/c㎡)
- Function and contact condition of E/R funnel damper
- Condition of Fireman’s outfit
- Closing condition of A-class fire door
- Fire doors in normal operation
- Installation of insulation for heat surface
- Enough ventilation of cargo holds before entering a port
- Check operation of water mist system
- Check of breathing apparatus and its attachment
- Self-closing valves for sounding pipes and for level indicators
- Operation and maintenance of main engine oil cooler
- Sprinkler nozzles in normal working condition without blockage of deposits in the nozzles
ISM
- Implementation of Fire and Abandon ship Drill and record
(See attached Check point of Fire and Abandon ship Drill in UK)
- Black out test (simulation test) and crews’ familiarity with it
- Crews’ familiarity with the operation of CO2 system (delay time, bottle quantity, etc.)
- PSCO emphasizes implementation of ISM and checks real-time NIR database
- Drill records for emergency response
- SMS on board properly implemented
- Crew familiarization with machinery and position of equipment on board
- Correspondence and familiarization of SOLAS training manual and equipment on board
- Check effectiveness of emergency drills and familiarity related to responsible equipment/
installation/appliances and system
- Crew familiarization with lifeboat operation
- Compliance of procedures for enclosed space entry
- Check compliance of COLREG of duty officers
- MLC(Working and Living Condition)
- Crews protection (safety devices)
- Crew’s including captain and C/E working hour and resting hour record
- Toilet operation in accommodation
- Accommodation cleanness
- Wages paid regularly and in full accordance with seafarer’s employment agreement(SEA)
- Period of seafarer’s contract
- Expiry date of medicine
- Life Saving Appliances
- Immediate start of em’cy equipment under very cold weather
(Starting of em’cy generator engine & lifeboat engine, etc.)
- Magnetic compass in lifeboat
- Hydraulic system in launching appliance for rescue boat
- Condition of rescue boat and liferaft
- Navigation and radio equipment in good working condition for immediate use
- EEBDs with sufficient air pressure and good working condition
- Pollution Prevention
- Operation of sewage treatment plant
- Inspection related to SOx emission (bunker notes, sampling log book, bunker change procedure)
- Operation of quick closing valve (including em’cy generator DO tank)
- Control of garbage (garbage record, galley and toilet condition etc.)
- Changing over fuel oil with Sulphur below 1.0% before entering into SECA area
- Procedures for fuel changeover when entering SECA
- Function of oily water separator and 15ppm alarm check (oil check inside discharge pipe and check for proper record of oil record book)
- High water level alarm(Eng. room)
- Hatch cover hydraulic cylinder in good working condition
- Oily Water Separator (OWS) in proper working condition
ILL
- Condition of structure (hatch cover cleat, air vent head)(hammering test)
- Function of water ingress system and de-watering system
- Manhole properly secured, closed
- Certificate and Documentation
- Each Certificate (ESP File) and valid crew’s license
- Valid Medical Certificate
Safety of Navigation
- VDR function and random alarm test and normal condition check after reset
- Navigation plan (berth to berth) and up-to-date notice to mariner, chart and publication
- Function of GMDSS (DC Power) and familiarity with GMDSS equipment
- Check condition of navigation lights
- Check ECDIS/ENC in use up to date
Others
- Ten (10) major detainable deficiencies and overall inspection
- Extended inspection for bulk carrier more than 15 years
- Any obstacles to interrupt safety escape from emergency escape route from E/R
- Corrosive condition of Gangway
- Engine room and S/G room cleanses (connections for piping system, oily insulation for piping, around D/G fuel pump, purifier room floor.
- Boiler water level sight glass in normal condition
- Incinerator properly maintained and in good working condition
- Em'cy lights in good working condition
请稍候,系统正在生成您请求的文件
东京备忘录PSC滞留与缺陷的检查趋势总结
扫码过程中请勿刷新、关闭本页面,否则会导致支付失败
购买后请立即保管好,30天后需重新付费。
东京备忘录PSC滞留与缺陷的检查趋势总结
扫码过程中请勿刷新、关闭本页面,否则会导致支付失败
购买后请立即保管好,30天后需重新付费。
请点击下载或复制按钮进行操作
如果觉得我的文章对您有用,请随意打赏。你的支持将鼓励我继续创作!